We've been working all Spring Break (it's over already?!) and we're really proud of ourselves! The bridge has been tested for the full lateral load test and half of the vertical load test. School resumes tomorrow and our construction team has a full academic load, so we're practicing 6:30-9am Mon-Wed. Come out and watch us behind the structures lab if you can wake up :)
2008 Student Steel Bridge Construction Team:
Alex Chung
Donson Liu
Jackie Young
Jay Kim
Josephine Hsai
Here's a video of the 2007 UCI Steel Bridge Team (Donson Liu, Hanson Yu, Joe Molinaro, Nestor Godinez, Zack Danilo, and me as super intendant)
I also found this youtube video of 2007 National Steel Bridge Competition.
http://www.youtube.com/watch?v=yquKTMeoLO8
Sunday, March 30, 2008
Friday, March 28, 2008
Friday, March 14, 2008
Winter Design Review
Once again we are preparing for the MAE Design Review. This time, we have decided to put most of our work into the bridge, not the presentation. It'll be interesting. MAE's hate us anyway! We're not trying to impress them anyway! We put up a picture of the slaves of steel bridge. Enjoy!
Subscribe to:
Posts (Atom)